Monday, December 04, 2006

OT: Swimming Pool Construction: Day 8

Today the concrete walls were poured and the trench around the outside was filled with dirt and gravel as a base for the decking. If you look closely at the photo, you can see two vertical marks at the back of the wall. That is where ground water is seeping through the concrete and into the deep end of the pool.